Preconstruction

Cost Code Definition

Set the project’s cost code structure — starting from the company standard — and apply project-specific overrides before building the budget.

Updated June 1, 2026Who this is for:
Estimator
Accountant
Project Admin
Open in Syntecton

Cost Code Definition sets the chart of cost codes for this project. It typically starts from your company’s standard cost codes and divisions, then you apply project-specific overrides where a job needs something different.

Define project cost codes

1

Open Cost Code Definition

Go to Preconstruction → Cost Code Definition.
2

Inherit the company structure

The company standard divisions and codes load as the starting point.
3

Apply project overrides

Add, hide, or relabel codes for this project. Overrides apply only here and don’t change the company standard.

Troubleshooting

A code I need isn’t available

If it should exist on every job, add it to the company standard instead of overriding per project.