Risk Signals
Surface emerging project risks, review the signals Syntecton flags, add notes, and turn them into tracked action items.
Updated June 1, 2026Who this is for:
Open in SyntectonProject Manager
Company Admin
Project Engineer
Risk Signals highlight conditions that may threaten cost, schedule, or quality — before they become problems. Each signal can be reviewed, annotated with notes, and converted into action items organized into sections.
Work the risk list
1
Open Risk Signals
Go to Project Control → Risk Signals to see the current signals for the project.
2
Review and annotate
Open a signal to see why it was raised. Add a note to capture context or your assessment.
3
Create action items
For signals that need follow-up, add action items under the relevant section and assign ownership so the response is tracked.
Troubleshooting
A signal looks like a false alarm
Add a note explaining why and dismiss/close it — the rationale stays on the record.