Project Control

Risk Signals

Surface emerging project risks, review the signals Syntecton flags, add notes, and turn them into tracked action items.

Updated June 1, 2026Who this is for:
Project Manager
Company Admin
Project Engineer
Open in Syntecton

Risk Signals highlight conditions that may threaten cost, schedule, or quality — before they become problems. Each signal can be reviewed, annotated with notes, and converted into action items organized into sections.

Work the risk list

1

Open Risk Signals

Go to Project Control → Risk Signals to see the current signals for the project.
2

Review and annotate

Open a signal to see why it was raised. Add a note to capture context or your assessment.
3

Create action items

For signals that need follow-up, add action items under the relevant section and assign ownership so the response is tracked.

Troubleshooting

A signal looks like a false alarm

Add a note explaining why and dismiss/close it — the rationale stays on the record.